Our Projects
As a professional steam turbine manufacturer and integrated industrial steam turbine system solution provider, we deliver turnkey steam turbine generator projects covering a full power range from 1MW to 60MW, including back-pressure, condensing, and extraction-condensing units. We combine in-house design, precision manufacturing, and full-process engineering to build reliable, high-efficiency power solutions for captive power plants, waste heat recovery, biomass power generation, CHP cogeneration, and industrial process energy systems.
Each project is customized to match on-site steam parameters, load demands, and industrial scenarios, with strict quality control throughout production, installation, commissioning, and after-sales service. We support global project delivery with complete export certifications and one-stop EPC services, helping clients optimize energy efficiency, reduce operational costs, and achieve stable, low-carbon industrial power supply.
Part of Successful Cases
Shanxi CECEP Lu'an Power Energy Saving Service Co., Ltd.
F30-SF-D-07-E-C flow structure repairing of 30MW extraction condensing steam turbine
Shandong Luli Group Co., Ltd.
CC60-8.83/3.92/0.98 flow structure technical retrofit of 60MW HT/HP double extraction condensing steam turbine
Wanbei Coal-electricity Group Qidong Coal Gangue Electric Power Plant
C12-4.9/0.981//470 flow structure technical retrofit of 2 unit of 12MW extraction condensing steam turbine
Henan Jinkong Tianqing Coal Chemical Co.,Ltd.
N12-0.7//230 12MW LT/LP condensing steam turbine (WHR)
Shanxi Jincheng Dongfang Industrial Co., Ltd
B6-3.5/0.5/450 6MW MT/MP Backpressure Steam Turbine Waste Heat & Pressure Utilization
Henan Jinkong Tianqing Coal Chemical Co.,Ltd.
CB20-9.1/4.74/0.77 20MW HT/HP extraction back pressure steam turbine.
Shandong Xinlong Group Co.,Ltd.
B15-8.83/1.57 Technical retrofit of 15MW HT/HP back pressure steam turbine Unit 2#.
Shanxi Senze Coal and Aluminum Co., Ltd
B3.4-8.83/6.4//535 Technical retrofit of 3.4MW HT/HP back pressure steam turbine.
Jinjiang Group Sanmenxia Kaiman (Shan County) Energy Sources Comprehensive Utilization Co.,Ltd.
B20-8.83/1.08 Technical retrofit of 20MW HT/HP back pressure steam turbine generator.
B2.1-6.4/0.981 Technical retrofit of feed water pump from electricity driving to steam driving.